SMED
**** Hidden Message *****making setup instructions actions• required tools
• required fixture materials
• storage, maintenance and check
of tools and fixtures• collection and transport of tools andfixtures
changing tools loosening and removing the old tools• placing and centring the new tool
• No distinction between on-line andoff-line operations
• Manufacturing process is stoppedduring the whole
setup• New tools are fetched after stoppingthe process
• neither tools nor fixtures areproperly maintained,
checked or prepared
• tools and fixtures are not properlystored
谢谢分享。 谢谢分享。 好资料,谢谢分享 看看!~~~~~~~~~~~~~~~~ 看看,究竟什么东东 谢谢楼主。。。。 看看,have a overview 谢谢分享,谢谢啊啊 啊啊 英文的,看起来有些吃力哟。
页:
[1]
2