精益大本营
标题: flexibility [打印本页]
作者: laker0000 时间: 2011-11-3 10:39
标题: flexibility
不错的柔性化生产资料,英语版本
Set-up A set up is a sequence of operations
which need to happen, in a given
workplace, to move from one product to
another.
Set-up time
The influence of Set-up on Flexibility
This is the time that passes from…
􀂾 … the moment when production of the last
piece, kilogram or good metre (meaning, without
defects and in technical speed), of a certain
product is finished
􀂾 … and the moment when production of the first
piece, kilogram, or good metre of the next
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
作者: spaceman 时间: 2011-11-3 11:54
缺少资料介绍和图片介绍 哈哈
作者: spaceman 时间: 2011-11-3 11:57
[attach]2615[/attach]
[attach]2616[/attach]
作者: 明明 时间: 2011-11-3 15:33
看起来不错哦!英语不行,看起来吃力.
欢迎光临 精益大本营 (http://leantps.net/) |
Powered by Discuz! X3.4 |