精益大本营
标题: 伟创力smedFBP-LSS-F135-A_SMED [打印本页]
作者: spaceman 时间: 2012-1-26 10:01
标题: 伟创力smedFBP-LSS-F135-A_SMED
伟创力smedFBP-LSS-F135-A_SMED
TIP: Ask yourself:
“How tight is tight
enough?”
“Do you need that
length of pipe welded to
your spanner?”
“Do you need that final,
teeth clenching
tightening?”
Problem:
Internal setups:
• Barrel Cleaning
• Mold unloading
• Mold Loading
• M/c. parameter setting
• Purging the Barrel
External setups:
- Unloading resin from hopper
- Raw material drying
- Drying Hopper cleaning
- Place mold (to be loaded) & tools near the M/c
Internal steps are those activities that must be performed when the
equipment is turned off / idle
External steps are those activities that can be performed in
anticipation of a changeover or while the current job is running
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
作者: gtsnake 时间: 2012-1-26 16:00
非常棒的快速换模材料,楼主辛苦了.
期望伟创力的单元生产、价值流等全套材料
作者: alexbu 时间: 2012-1-27 11:13
多谢王老大分享伟创力的资料
作者: zjmichan 时间: 2012-1-30 15:45
非常棒的材料,楼主辛苦了
作者: crd 时间: 2012-5-14 12:11
非常棒的材料,谢谢分享!
作者: cyw4671 时间: 2012-5-15 20:40
谢谢分享,学习了
作者: hedydbs 时间: 2012-5-15 21:54
分享成功,共享成长!
作者: ヤo.0n!y 时间: 2012-5-15 22:01
王总,你的英格利希不错
作者: hhk715 时间: 2013-8-28 20:58
非常感谢分享。
作者: alvin0791 时间: 2023-7-16 16:11
谢谢楼主分享
欢迎光临 精益大本营 (http://leantps.net/) |
Powered by Discuz! X3.4 |