伟创力smedFBP-LSS-F135-A_SMED
TIP: Ask yourself:
“How tight is tight
enough?”
“Do you need that
length of pipe welded to
your spanner?”
“Do you need that final,
teeth clenching
tightening?”
Problem:
Internal setups:
• Barrel Cleaning
• Mold unloading
• Mold Loading
• M/c. parameter setting
• Purging the Barrel
External setups:
- Unloading resin from hopper
- Raw material drying
- Drying Hopper cleaning
- Place mold (to be loaded) & tools near the M/c
Internal steps are those activities that must be performed when the
equipment is turned off / idle
External steps are those activities that can be performed in
anticipation of a changeover or while the current job is running
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领 |