伟创力看板拉动FBP-LSS-F140-A_Pull_Kanban
Pull Production Systems: actual consumption drives production
scheduling and material replenishment
Pull Production Systems are…
 Simple
 Usually manual rather than computer based
 Visual
 Visual signals authorize movement of WIP and raw materials
 Flexible
 Encourage continuous improvement of manufacturing processes
A “ull” mechanism provides immediate visibility of consumption
MRP is not used for ordering material
 However, a monthly forecast is still sent to suppliers to provide guidance
on future requirements
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领 |